Case study · OYAK Çimento
We provided full owner's engineering on OYAK Çimento's Beypazarı solar project.

The 97.8 MWe / 115.5 MWp plant in Beypazarı, Ankara, covers about 150 hectares with some 211,000 modules. Türkiye's largest solar plant built for self-consumption, it is expected to generate around 182,000 MWh a year and raise the share of renewable energy in OYAK's cement plants to 25 percent. In scale and scope it is a first for the cement sector.
Meeting the electricity needs of cement production from renewable sources is an important part of the sector's energy transition.
We assessed the tender and technical documents and shared our opinion. We reviewed the EPC contractor's designs and followed the site works as owner's engineer. Throughout the project we supported the assessment of the technical requirements and the supervision of the works.
This work shows the role we take on as a long-term technical partner in the solar investments of industrial companies. The real aim was to help the cement sector cut its carbon emissions and ease its move to a lower-carbon future.
Sources: CNBC-e · S&P Global · Ekonomi Gazetesi