Our solar panel inspection services cover both the manufacturing and installation phases. We carry out quality control through physical on-site inspections and a thorough analysis of technical documents, production records and test data.

In factory acceptance tests (FAT) we use PV module testing to check whether the solar modules are produced correctly and to their specification, and we carry out a pre-shipment inspection before the modules leave the factory. Construction monitoring on site follows the same approach.

Two technicians in hard hats checking the underside of a module structure with a meter and a tablet

How we work

We start from a quality control plan. At the factory we inspect production records and acceptance tests, and on site the works and the installation, against the checkpoints in that plan, and we report what we find.

Get in touch

  • Inspector in a hard hat working on a tablet on site

    Quality control plan

    We set out the quality control plan that fixes the checkpoints for solar panel quality, equipment supply and the works on site.

  • Solar modules on a manufacturing line

    Factory acceptance tests

    Through factory acceptance tests and module testing, including the flash test of each solar panel, we check that the modules are produced to their specification.

  • Data charts on a laptop and a phone

    Review of production data

    Solar panel testing, from the flash test to electroluminescence testing, produces I-V results and EL images for every module. We review them with image-processing tools we developed ourselves, so that every module is assessed against the same criteria, efficiently and with little room for error.

  • Engineer checking ground-mounted module rows with a document

    Site quality inspection

    We inspect the works on site and the quality of installation against the project requirements.

What we deliver

Our deliverables are set by the scope of each job; we do not hand over the same report package on every project.

  • Two inspectors checking work on a production floor

    A quality control plan

    We put the checkpoints to be inspected and the acceptance criteria in writing at the start of the work.

  • A magnifier and steel ruler over a technical drawing

    Document reviews

    We compare specifications, certificates and quality records with the project requirements.

  • A solar module on a production line

    Production or site inspection records

    We record the checks we make at the factory and on site, with the non-conformities we find.

  • An inspector in a high-visibility vest writing on a clipboard

    Technical reports

    We bring the scope of the inspection, the criteria used and the results together in one report.

FAT · IEC 61215 · IEC 61730 · IEC 62759-1 · IEC TS 62941 · Our accreditation scope

Our references in this area

All projects

Our expert in this area

In factory acceptance testing our aim is to show, from the data, that the modules were produced as the specification says.