Solarian One: site inspection and progress tracking for solar plants.

Solarian One is the app our engineers use to record inspections and track progress on site. It brings together checklists, photographs, findings and daily progress records. Clients can follow findings and view issued reports through a dedicated project link.

Inspector in a hard hat working on a tablet on site

Findings are recorded on site.

Our engineers record findings directly against the checklist, adding photographs and locations while they are on site. The same record feeds the inspection report, punch list and client view.

Site inspection and progress

Our engineers carry Solarian One on their phones. It holds the installation checklist for every discipline of the plant, from the mounting structures to the medium voltage switchgear, and each item names the standard, project document or manufacturer's instruction it is checked against. It works offline and syncs when a connection is available. Our office team prepares the day's inspection report and progress report from the same records.

Standards applied

  • IEC 62446-1
  • IEC 60364-7-712
  • IEC 60364-6
  • IEC 62548
  • IEC 61439-1
  • ISO/IEC 17020

The inspection report is issued under our ISO/IEC 17020 accreditation.

Solarian One in 30 seconds: from the checklist on site to the client's link.

What One does on site and in the office

  • Guided checklists

    More than 500 items across 22 disciplines show the engineer what to check and against which criterion.

  • Evidence for every finding

    Every non-conforming item is recorded with a finding and its photograph, every measurement with the calibrated instrument used.

  • Track findings through to closure

    Each finding on the punch list has a deadline: before energisation, before client acceptance or before final acceptance. A resolved finding is verified with photographs from before and after.

  • Daily progress

    Installed quantities, workforce, machines, deliveries and weather are recorded each day, and progress is compared with the schedule on an S-curve.

  • Report review and approval

    Each report is prepared, checked and approved, and its revisions are kept.

  • A project link for the client

    The client sees the layout plan with its findings pinned, the schedule and the issued reports from one link, and receives each report by email as it is issued.