All projects
Aksa Energy - Göynük Coal Plant Hybrid SPP - Bolu
We provided full owner’s engineering on the 30 MWp solar plant integrated with Aksa Energy’s 300 MW coal-fired power plant at Göynük, Bolu. We analysed energy yield and the hybrid integration, and contributed to the feasibility study.
Scope: Owner's and lender's engineering
- Owner's Engineering
- Production Work
- Hybrid Integration Analysis
- Feasibility Study
- 30MWp · Capacity
- 2023Year