All projects

Aksa Energy - Göynük Coal Plant Hybrid SPP - Bolu

We provided full owner’s engineering on the 30 MWp solar plant integrated with Aksa Energy’s 300 MW coal-fired power plant at Göynük, Bolu. We analysed energy yield and the hybrid integration, and contributed to the feasibility study.

Scope: Owner's and lender's engineering

  • Owner's Engineering
  • Production Work
  • Hybrid Integration Analysis
  • Feasibility Study
  • 30MWp · Capacity
  • 2023Year

All projects

Capacity
30 MWp
Province
Bolu
Country
Türkiye
Year
2023
Investor
Aksa Enerji